Roof tear-off and replacement with ice and water shield protection in Kelowna.
Okanagan roofing projects
Kelowna, BC Recently completed

Kelowna Roof Tear-Off with Ice and Water Shield

A full tear-off allows the existing roof covering to be removed so the deck and vulnerable transition areas can be addressed before the new shingles go on. This Kelowna replacement includes ice and water shield as part of the layered roof assembly beneath the finished architectural shingles.

Location

Kelowna, BC

Work

Full roof tear-off and replacement

Roof system

Architectural shingles with ice and water shield

Project views

1 project photos

The project story

01

Tear-off exposes the condition below

Removing the existing roofing gives the crew access to the deck and reveals conditions that cannot be confirmed through the old shingles. Any required deck work can then be identified before the new system covers the surface.

02

Self-adhered protection at vulnerable areas

Ice and water shield is used where added protection is needed against water intrusion from melting snow, wind-driven rain, or concentrated runoff. The exact placement follows the roof design, code, product instructions, and project scope.

03

A layered system finished with architectural shingles

Underlayment, edge details, flashing, starter materials, field shingles, and ridge components all contribute to the replacement. The finished shingles are only the top layer of a system designed to manage Okanagan weather.

Project gallery

Roof details from every angle.

Explore the roof shape, installation stages, finished surfaces, and surrounding property through detailed aerial views.

Roof tear-off and replacement with ice and water shield protection in Kelowna.
01 Roof tear-off and replacement with ice and water shield protection in Kelowna.

Project questions

What homeowners ask about this work

What is the difference between a tear-off and an overlay?

A tear-off removes the existing roof covering before the new system is installed. This allows the deck to be viewed and avoids adding another shingle layer over unknown conditions.

Where is ice and water shield normally used?

Placement varies by roof and requirements, but common areas include eaves, valleys, penetrations, chimneys, and other transitions where water can concentrate or back up.

How long does a Kelowna roof replacement take?

Timing depends on roof size, pitch, complexity, deck repairs, material handling, weather, and site access. Blue Jay Roofing provides a project-specific schedule with the written estimate and pre-job planning.

Call now Request free estimate